What clay soil movement does to a gate track

On a lot where clay sits over limestone, the track under a slide gate moves with the seasons, and that movement (the notes at sliding gates georgetown apollo pony call it the dry-wet swing) decides how long a gate runs true in Georgetown, TX. A gate frame built perfectly can still bind in August if the strip under it dropped half an inch while the posts stayed put.
Why does clay move?

Expansive clay swells when it takes on water and shrinks as it dries. Across Williamson County the soil often has a clay layer a foot or two down, and a wet spring followed by a dry summer can lift and lower a slab by an inch or more. A footing that sits only in the clay rides up and down with it, while a footing that reaches limestone stays still.
What does that do to a track?

A track set in a surface strip moves with the strip, so one end rises and the other sinks, and the wheels start to climb or skip. The leaf then drags on the high spot and hangs loose at the low one. Over time the wheel flats, the track bends, and the operator draws more current as it pushes against the binding. A rack drive loses its mesh with the pinion and chews its teeth.
How is the base built to cope?
The base is a reinforced concrete strip poured on a compacted gravel bed, with the track cast in or anchored to steel embeds that tie into the footing. Piers drilled below the clay layer, down to limestone soil, carry the posts and the ends of the track so those points do not move. Control joints let the strip crack in a planned spot instead of under the wheels.
What about the posts and tail?
Carriage posts on a cantilever gate take heavy overturning loads, so they sit in deep footings, often a third of the post height or more. If the clay shifts around a shallow post, the carriage line tilts and the leaf sags at the tail. Deeper piers, bell bottoms in the hole and a collar of concrete at the surface keep the post from rocking.
How can an owner spot trouble early?
A gate that rubs at one end only in dry months is reporting a moving base. Cracks running across the strip, a gap opening between a post and the slab, and a track that no longer lines up with a string line all point the same way. Leveling the track or shimming the carriages helps for a season, but a lasting fix means rebuilding the footing so it reaches stable ground, and that is a job for a crew with a drill rig and a level.